Technical Buildings / Container Buildings / Containers

  • Private Penthouse
  • Medion AG, Essen
  • Sports Field Building, Berlin
  • Staff and Office Building, Schradenbiogas GmbH
  • Havelbus-Verkehrsgesellschaft, Beelitz
  • Savings Bank, Ingolstadt
  • S-Bahn, Frankfurt
  • Control Centre, University Hospital Heidelberg
  • TOTAL Petrol Station
  • Jet Petrol Station, Berlin
  • Control Station, Düsseldorf Airport
  • Research Centre, Antarctica
  • Engineering Container

Contact

Contact us:

Phone: +49 2294 694-761
Fax: +49 2294 694-38
E-Mail:  info@saebu.de
 

Shop Buildings in Modular Construction Reduce Construction Time to a Minimum

Sophisticated modular construction concept for the modernisation of existing petrol stations ensure a quick resumption of business operations

For several years now Jet petrol stations are renovated all over Germany. This also includes attractive and functional shop buildings that are erected in modular construction.

Until 2010 there were two shop sizes with either 90 m² or 70 m² surface consisting of room units that were prefabricated for 90% in our factory. Additionally, collection stations were installed. The collection station consists of 3 parts, one part for the storage of beverages one part for the storage of refuse bins and special part for the storage of hazardous substances that are daily used at petrol stations.

Since 2011 we are producing shop buildings with a shop surface of 84 m² with bakery and bistro or with a size of 60 m² without these areas. The collection station is integrated in this building.

Production at our factory requires approx. 6 weeks, counted from order date to despatch date due to the purchase of the necessary vendor parts.

The course of a building assembly can take place as follows: despatch of the single units on Monday, transport to the construction site at night, complete assembly of the single modules on Tuesday and handover of the building to the constructor on Friday.