New Construction of a Multi-Storey Accommodation Building in Prefabricated Steel Construction
On the grounds of the Zentrum Innere Führung in Koblenz, SÄBU constructed a four-storey accommodation building using modular construction, topped by a recessed technical storey. Existing buildings were demolished beforehand to make way for the new building.
In the open tendering procedure, we as a modular construction company were awarded the contract to erect the new building in steel construction on a turnkey basis.
The new accommodation building houses 92 guest rooms with high-quality equipped bedrooms and adjacent sanitary facilities, as well as some adjoining rooms.
The new accommodation building houses 92 guest rooms with high-quality equipped bedrooms and adjacent sanitary facilities, as well as some adjoining rooms.
small-block-left
The building has a cubature of 52 m length, 14 m width and 17 m height. The storey height is 3.40 m.
The prefabricated building, which does not have a basement and is accessible without barriers, has an additional staggered storey for the entire technical equipment. It contains a lightning protection system, a fire alarm system, a house alarm system, a telecommunication system as well as air-conditioning and ventilation systems.
The building is accessed via two entrances, each with a staircase.
The prefabricated building, which does not have a basement and is accessible without barriers, has an additional staggered storey for the entire technical equipment. It contains a lightning protection system, a fire alarm system, a house alarm system, a telecommunication system as well as air-conditioning and ventilation systems.
The building is accessed via two entrances, each with a staircase.
small-block-right
The specifications included the construction of the turnkey building including site safety, access roads and construction roads as well as the execution of the supply and disposal media.
Electricity, data cables, local heating network and the coordinates of all building automation services by other contractors were also included.
Electricity, data cables, local heating network and the coordinates of all building automation services by other contractors were also included.
small-block-left
The accommodation building was tendered in accordance with the “Nachhaltig Bauen” guidelines (Sustainable Construction). During the planning process, care was taken to use the available space as efficiently as possible and to take life-cycle costs into account. These include, in particular, maintenance and upkeep costs.
The possibility of a future change of use was also considered from the outset. Modular construction provides a good basis for this.
The possibility of a future change of use was also considered from the outset. Modular construction provides a good basis for this.
small-block-right
SÄBU was awarded the contract on the basis of the most economically advantageous tender. The modular steel construction method also offers opportunities for future structural modifications and extensions.
Rooms can be designed from the outset to serve multiple purposes and adapt to changing usage requirements, allowing the building to remain flexible in the long term.
Rooms can be designed from the outset to serve multiple purposes and adapt to changing usage requirements, allowing the building to remain flexible in the long term.